June
Working on the 432 "bedspring" |
Working on the 432 "bedspring" |
432 tower work |
The Monument |
||
6m H-frame ready for launch |
6m H-frame mid flight |
installing the 6m H-frame at the top of the monopole |
6m H-frame on the monopole |
climbing down from the monopole |

Page last updated: 30-Jun-2003 by K2JJB