June
|
The token 'SZ setup picture |
Brian WA1ZMS brings 47GHz to Greylock for the first time |
August
|
The token 'SZ setup picture |
The microwave (903 and up) truck and towers |
Solid state power arrives and the tube 1296 amp is put out to pasture |
|
Brian WA1ZMS climbs the 903/1296 tower |
September
|
The token 'SZ setup picture |
High ambient humidity |
The monument gets a face lift |
|
Kip N2XRE on the high microwaves (10/24) tower |
Sunset on Mt. Greylock |
Operation in the VHF truck |
Page last updated: 30-Jun-2003 by K2JJB
![[]](../timeline/jun97_setup_sm.jpg)
![[]](../timeline/jun97_wa1zms_47ghz_sm.jpg)
![[]](../timeline/aug97_setup_sm.jpg)
![[]](../timeline/aug97_microwaves_sm.jpg)
![[]](../timeline/aug97_retired1296_sm.jpg)
![[]](../timeline/aug97_wa1zms_sm.jpg)
![[]](../timeline/sep97_setup_sm.jpg)
![[]](../timeline/sep97_cloud_sm.jpg)
![[]](../timeline/sep97_monument_sm.jpg)
![[]](../timeline/sep97_n2xre_10g_sm.jpg)
![[]](../timeline/sep97_sunset_sm.jpg)
![[]](../timeline/sep97_vhftruck_sm.jpg)